Case Study — Dujardin Bretagne
Industriel de la
Insurer requirementReducing production downtimeLimiting material damageRegulatory compliance
Systems installed
30
Year
2025
Department
35
Site constraint
Site with cabinets distributed across numerous plenums, some with regulated access. Following the insurer's recommendation and as part of a group-driven safety initiative, our equipment was approved by headquarters.
Our response
An on-site study was conducted, examining and accounting for each cabinet configuration. The goal was to implement a technical solution with sprinkler heads, detection tubing, and supplementary dry contacts across the entire site.
Result
Our client is satisfied with the service, and the insurer has recommended us for other industrial sites within the group.